September 8, 2010
20 Kilowatt Wind Turbine soon to be erected in Saint Mary's (Once it stops raining)

I figured I would update my status. The turbine is ready to get erected, but now it is raining. I have a crane ready to raise the tower, and as soon as the ground is not muddy and the crane will not get stuck, the tower will go up. Here are pictures of the turbine:


I will make a video of the tower raising and put on the Blog. Should be a pretty neat video. Now wind technology is not necessarily for everyone, but if you should consider it, I have made it easier for you. A Variance is not required if you put up a turbine in the Critical Area.